This project was carried out in "Hamisheh Bahar" Park in the city of Yazd, where the playground and the swing zone needed a durable, impact-absorbing surface suited to a hot summer climate. Farabazyaft manufactured, delivered and installed two-tone interlocking rubber granule tiles, completing the full fit-out of the space in one week.
Background image: final project handover, 22 June 2026
Project summary
Installing flooring outdoors in Yazd is not simply a matter of laying product; durability under direct sun, thermal expansion, safety around the swing zone and speed of delivery all have to be managed at the same time.
Location
Yazd, Azadshahr Boulevard, Fourth Roundabout, Golestan-e Sharghi, Amir al-Mo'menin Mosque Alley.
Application
Fit-out of the playground and swing zone at Hamisheh Bahar Park for daily use by children.
Product installed
Grade 1 export-quality interlocking rubber granule tile, two-tone red and black, 20 mm thick.
Technical conditions
Resistant to UV exposure and to dimensional change caused by summer heat.
The project in pictures
Three key frames show how a bare urban surface was turned, step by step, into a space ready for use.
Before installation
A hard concrete surface beneath the swings and along the play route needed an impact-absorbing, durable and maintainable covering.
During installation
Once produced and delivered, the tiles were laid out and fitted on site so the play area could be made ready with minimal downtime.
After handover
The red and black tile combination made the boundaries of the playground clearer to read and the swing area safer.
Flooring specifications
The product selected for this project is made from recycled tyre granulate — a solution that improves the safety of the play area while returning material to the consumption cycle.
- Interlocking structure for orderly installation, easier replacement and full coverage of the swing zone.
- 20 mm thickness to absorb impact and reduce direct contact with the hard surface underneath.
- A formulation resistant to sunlight and to the expansion caused by Yazd's summer heat.
- Quality control across production, delivery and installation, with an unconditional 6-month warranty after handover.
Two tones — legible and in keeping with the urban setting
A one-week process
The schedule was tight from the outset, so the work moved forward in a compressed but controlled sequence — from order placement to final handover on site.
Requirements survey and order intake
The installation area, square metreage, thickness, colour combination and outdoor durability requirements were defined.
Production and preparation
The interlocking granule tiles were manufactured to the project's technical specification and packed for transport.
Delivery and on-site layout
The product was transported to the park and the installation team set out the initial layout to suit the swing zone and the play route.
Installation, commissioning and handover
After the pieces were fitted, the surface checked and the final review completed, the project was handed over on 22 June 2026.
An outcome beyond simply covering a surface
This installation turned the playground from a dry, hard surface into a space that is easier to read, softer underfoot and better suited to everyday use — a small change in appearance, but a meaningful one for children's experience and for municipal upkeep.
Ready to run a similar project?
Contact us for advice on selecting rubber granule flooring, estimating your area, and planning from production through to installation.